Sewer Video Inspection Report Form Page

Locations of lateral connections (e.g., "Wye at 15ft") or changes in material. 4. Summary & Recommendations

Below is the standard content structure for a professional report. 1. Project & Site Information Sewer Video Inspection Report Form

Ground conditions (e.g., dry, heavy rain) that might affect flow. 2. Pipeline Specifications Asset ID: Manhole-to-manhole ID or specific lateral tag. Locations of lateral connections (e

Standard codes (like PACP) or shorthand (e.g., RM for Root Mass). Locations of lateral connections (e.g.

2–4 high-resolution stills of the most critical defects found. 6. Sign-off Technician Signature: Confirms accuracy of the field data.

Locations of lateral connections (e.g., "Wye at 15ft") or changes in material. 4. Summary & Recommendations

Below is the standard content structure for a professional report. 1. Project & Site Information

Ground conditions (e.g., dry, heavy rain) that might affect flow. 2. Pipeline Specifications Asset ID: Manhole-to-manhole ID or specific lateral tag.

Standard codes (like PACP) or shorthand (e.g., RM for Root Mass).

2–4 high-resolution stills of the most critical defects found. 6. Sign-off Technician Signature: Confirms accuracy of the field data.